Bergschenhoek - concrete-sided cutting

In Bergschenhoek the HSL will largely disappear from sight thanks to the construction of a semi-sunken concrete U box cutting about three kilometres long. On its east side the land will be built up to provide a park-like appearance and serve as an acoustic barrier.

Werkzaamheden aan de verdiepte tunnelbak bij Bergschenhoek.

4-12-2008 - HSL-Zuid